POWERGRID CORPORATION OF INDIA LIMITED
WESTERN REGIONAL LOAD DESPATCH CENTRE,MUMBAI
Transmission Losses for Sunday, August 01, 2010
Date :
ESTIMATED TRANSMISSION LOSS
GUVNL
4.32
MPSEB
4.70
CSEB
5.00
MSEB
4.85
GOA
4.50
DVC
3.38
WBSEB
3.10
PSEB
6.00
WR
4.50
ER
2.40
SR
4.27
NR
3.25
NER
2.90
APTRANSCO
4.13
HIMACHAL
0.00
UPCL
5.00
MEGHALAYA
3.00
KARNATAKA
4.00
KSEB
0.75
DTL
1.50
HPGCL
2.10
APPCC
4.13
TNEB
1.75
KPCL
4.00
OPTCL
4.00
MCPL33KV
0.20
MCPL132KV
0.00
MPDISCOM
6.00
DELHI
1.50
HARIYANA
4.23
RVPNL
4.40
APDISCOM
4.49
Note: ESTIMATED TRANSMISSION LOSS declared by LDC’s used for scheduling.
Note : VARIABLE CHARGES OF KAWAS GAS, KAWAS RLNG, , GANDHAR GAS AND GANDHAR LNG (ALL CLOSED CYCLE) RATES ARE 1.96, 3.30, 2.08 , 3.18 RESP. TENETAIVE OPENCYCLE COST FOR KAWAS 2A&2B IS RS.2.70 KAWAS 2A AND 2B ARE IN OPEN CYCLE ON CHEAPER GAS
* ANY DISCREPANCY IN SCHEDULE MAY BE INTIMATED AT THE EARLIEST
© All Rights Reserved WRLDC,Mumbai.