POWERGRID CORPORATION OF INDIA LIMITED
WESTERN REGIONAL LOAD DESPATCH CENTRE,MUMBAI
Transmission Losses for Saturday, February 04, 2012
Date :
ESTIMATED TRANSMISSION LOSS
GUVNL
4.28
MPSEB
4.70
CSEB
4.67
MSEB
4.31
GOA
4.50
DVC
4.03
WBSEB
3.10
PSEB
5.70
UPCL
5.00
MEGHALAYA
3.00
KSEB
0.75
DTL
1.25
APPCC
4.10
TNEB
1.75
KPCL
4.00
OPTCL
4.00
HARIYANA
4.23
RVPNL
4.40
Note: ESTIMATED TRANSMISSION LOSS declared by LDC’s used for scheduling.
Note : VARIABLE CHARGES OF KAWAS GAS APM,NON APM ,KAWAS RLNG, GANDHAR GAS APM,NON APM AND GANDHAR LNG (ALL CLOSED CYCLE) RATES ARE 2.16 3.84 7.423, 2.15,3.78, 7.480 ESPECTIVELY.GANDHAR GT 1 IS IN CLOSE REVERSE.
* ANY DISCREPANCY IN SCHEDULE MAY BE INTIMATED AT THE EARLIEST