POWERGRID CORPORATION OF INDIA LIMITED

WESTERN REGIONAL LOAD DESPATCH CENTRE,MUMBAI

Revision due to:RGPPL DC REV
Issue on: 4/2/2012Message No.: LD/02/304Time : 20:14
Date : Exchange : DATA:

UTILITY ER-WR SR-WR NR-WR KAWAS-GAS VSTPS-I VSTPS-2 GANDHAR KAPS TAPS-I GUVNL MPSEB CSEB MSEB GOA DD DNH KSTPS VSTPS-3 JPL LAMKPL ACBIL JSPL_DCPP
INJ/DRW INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL INJECTION DRAWAL
Note : VARIABLE CHARGES OF KAWAS GAS APM,NON APM ,KAWAS RLNG, GANDHAR GAS APM,NON APM AND GANDHAR LNG (ALL CLOSED CYCLE) RATES ARE 2.16 3.84 7.423, 2.15,3.78, 7.480 ESPECTIVELY.GANDHAR GT 1 IS IN CLOSE REVERSE.
        * ANY DISCREPANCY IN SCHEDULE MAY BE INTIMATED AT THE EARLIEST
  © All Rights Reserved by WRLDC,Mumbai.