canakkale canakkale gelibolu balik tutma

POWERGRID CORPORATION OF INDIA LIMITED

WESTERN REGIONAL LOAD DESPATCH CENTRE,MUMBAI

Schedule (in MW) of for Sunday, August 01, 2010
Revision due to :KORBA UNIT # 2 SYN AT 01:50 HRS
Issue on: 1/8/2010Message No.: LD/8/3Time : 02:00
Date : CONS: Revison :
Note : VARIABLE CHARGES OF KAWAS GAS, KAWAS RLNG, , GANDHAR GAS AND GANDHAR LNG (ALL CLOSED CYCLE) RATES ARE 1.96, 3.30, 2.08 , 3.18 RESP. TENETAIVE OPENCYCLE COST FOR KAWAS 2A&2B IS RS.2.70 KAWAS 2A AND 2B ARE IN OPEN CYCLE ON CHEAPER GAS
        * EXTERNAL ISGS SCHEDULE ARE AT EX-WR BOUNDRY
        * ANY DISCREPANCY IN SCHEDULE MAY BE INTIMATED AT THE EARLIEST
        # UNREQUISITION POWER
  © All Rights Reserved WRLDC,Mumbai.