POWERGRID CORPORATION OF INDIA LIMITED

WESTERN REGIONAL LOAD DESPATCH CENTRE,MUMBAI

Schedule (in MW) of for Thursday, March 11, 2010
Revision due to :KORBA DC REV (38-96)
Issue on: 11/3/2010Message No.: LD/03/411Time : 08.30
Date : CONS: Revison :
Note : VARIABLE CHARGES OF KAWAS GAS, KAWAS RLNG, KAWAS LIQUID, GANDHAR GAS AND GANDHAR LNG (ALL CLOSED CYCLE) RATES ARE 1.07, 3.03, 6.74 ,1.26, 2.97 RESP.
        * EXTERNAL ISGS SCHEDULE ARE AT EX-WR BOUNDRY
        * ANY DISCREPANCY IN SCHEDULE MAY BE INTIMATED AT THE EARLIEST
        # UNREQUISITION POWER
  © All Rights Reserved WRLDC,Mumbai.